Data Collection / Inspection & Energy

Inspection and energy consumption data collection

Access to 3D measurement, visual inspection and Modbus Electricity and liquid instruments record processing results, energy consumption and equipment status.

Inspection and energy consumption data range

3D Measurement

Collect measurement program, version, workpiece serial number, inspection date and CheckData, associates equipment and batches by project.

Electric Modbus

Collect three-phase voltage, current, active power, reactive power, apparent power, power factor, frequency, and energy.

Fluids

Collect real-time flow, accumulated flow, pressure, temperature and equipment status for status query of on-site media such as coolant and gas.

Standard Field Directions

  • Inspection: Prog, Version, SN, Date, CheckData
  • Electricity: Ua, Ub, Uc, Ia, Ib, Ic, Pabc, EPP, CosPS
  • Fluid: RealFlow, TotalFlow, Pressure, Temp
  • Each data entry retains DeviceID, equipment name, status, and collection time

Business Applications

  • Bind inspection results to workpieces, programs, and equipment
  • Calculate unit energy consumption by equipment, work order, and shift
  • Detect abnormal fluctuations and trigger warnings or shutdown checks
  • Provide data for quality traceability, energy consumption statistics and business analysis

Integrate testing and energy consumption data into workshop management

Starting from a testing device or an electric meter, first confirm the interface, fields and statistical period.

Consult Data Collection Plan